Title Thermodynamic and Economic Evaluation of Gas Turbine Power Plants
Authors Oyegoke, T.
Akanji, O.I.
Ajayi, O.O.
Obajulu, E.A.
Abemi, A.O.
ORCID
Keywords energy conversion system
gas turbine
economic analysis
second law analysis
power plant
Type Article
Date of Issue 2020
URI https://essuir.sumdu.edu.ua/handle/123456789/77500
Publisher Sumy State University
License
Citation Oyegoke T., Akanji I. I., Ajayi O. O., Obajulu E. A., Abemi A. O. (2020). Thermodynamic and Economic Evaluation of Gas Turbine Power Plants. Journal of Engineering Sciences, Vol. 7(1), pp. G1–G8, doi: 10.21272/jes.2020.7(1).g1
Abstract Thermodynamic analysis and economic feasibility of a gas turbine power plant using a theoretical approach are studied here. The operating conditions of Afam Gas Power Plant, Nigeria are utilized. A modern gas turbine power plant is composed of three key components which are the compressor, combustion chamber, and turbine. The plants were analyzed in different control volumes, and plant performance was estimated by component-wise modeling. Mass and energy conservation laws were applied to each component, and a complete energy balance conducted for each component. The lost energy was calculated for each control volume, and cumulative performance indices such as thermal efficiency and power output were also calculated. The profitability of the proposed project was analyzed using the Return on Investment (ROI), Net Present Worth (NPW), Payback Period (PBP), and Internal Rate of Return (IRR). First law analysis reveals that 0.9 % of the energy supplied to the compressor was lost while 99.1 % was adequately utilized. 7.0 % energy was generated within the Combustion Chamber as a result of the combustion reaction, while 33.2 % of the energy input to the Gas Turbine was lost, and 66.8 % was adequately converted to shaft work which drives both compressor and electric generator. Second law analysis shows that the combustion chamber unit recorded lost work of 248.27 MW (56.1 % of the summation), and 77.33 MW (17.5 % of the summation) for Gas Turbine, while air compressor recorded 11.8 MW (2.7 %). Profitability analysis shows that the investment criteria are sensitive to change in the price of natural gas. Selling electricity at the current price set by the Nigerian Electricity Regulation Commission (NERC) at zero subsidies and an exchange rate of 365 NGN/kWh is not profitable, as the analysis of the investment gave an infinite payback period. The investment becomes profitable only at a 45 % subsidy regime.
Appears in Collections: Journal of Engineering Sciences / Журнал інженерних наук

Views

Australia Australia
-1448193413
Bangladesh Bangladesh
1
Brazil Brazil
1617563441
Canada Canada
1
China China
455916748
France France
97963
Germany Germany
1398580469
Ghana Ghana
216405723
Greece Greece
1
Hong Kong SAR China Hong Kong SAR China
1
India India
800865672
Indonesia Indonesia
1398580473
Iran Iran
2122815827
Iraq Iraq
455916750
Ireland Ireland
421525333
Japan Japan
-2041083979
Kenya Kenya
1741
Lithuania Lithuania
1
Mexico Mexico
1
Netherlands Netherlands
4022
Nigeria Nigeria
1398580472
Oman Oman
1
Pakistan Pakistan
234487
Russia Russia
421525331
Singapore Singapore
800865666
South Korea South Korea
2077022269
Sweden Sweden
1
Taiwan Taiwan
1
Thailand Thailand
1
Uganda Uganda
1
Ukraine Ukraine
800865677
United Kingdom United Kingdom
164394
United States United States
-2041083978
Unknown Country Unknown Country
800865676

Downloads

Australia Australia
1
Bangladesh Bangladesh
1
Brazil Brazil
2599643
Canada Canada
800865666
China China
1
France France
1
Germany Germany
1312342728
India India
-2041083977
Indonesia Indonesia
54459
Iraq Iraq
1820955764
Kenya Kenya
1
Lithuania Lithuania
1
Mexico Mexico
1
Nigeria Nigeria
26903
Russia Russia
1
Singapore Singapore
1398580474
South Korea South Korea
1
Taiwan Taiwan
1
Uganda Uganda
1
Ukraine Ukraine
111265
United Kingdom United Kingdom
1
United States United States
-2041083975

Files

File Size Format Downloads
Oyegoke_jes_1_2020.pdf 483.26 kB Adobe PDF 1253368962

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.