Please use this identifier to cite or link to this item:
https://essuir.sumdu.edu.ua/handle/123456789/81734
Or use following links to share this resource in social networks:
Tweet
Recommend this item
Title | Logistics control of the resources flow in energy-saving projects: Case study for metallurgical industry |
Authors |
Kiyko, S.
Druzhinin, E. Prokhorov, O. Ivanov, Vitalii Oleksandrovych ![]() Haidabrus, Bohdan Volodymyrovych Janis, Grabis |
ORCID |
http://orcid.org/0000-0003-0595-2660 |
Keywords |
energy-saving metallurgical enterprise logistics management resource flow енергозбереження металургійне підприємство управління логістикою потік ресурсів энергосбережение металлургическое предприятие управление логистикой поток ресурсов |
Type | Article |
Date of Issue | 2020 |
URI | https://essuir.sumdu.edu.ua/handle/123456789/81734 |
Publisher | 4S go, sro |
License | Creative Commons Attribution - NonCommercial 4.0 International |
Citation | Logistics control of the resources flow in energy-saving projects: Case study for metallurgical industry / S. Kiyko, E. Druzhinin, O. Prokhorov et al. // Acta logistica. — 2020. — Vol. 7, No.1. — P. 49-60. — DOI:10.22306/al.v7i1.159 |
Abstract |
The multilevel model for the formation and assessment of resource flows of a metallurgical enterprise is presented, which, at the logistics positions, reconcile the enterprise flow processes at all management levels, providing procedures for regulating the parameters of material and financial flows due to parametric and structural coordination in the short period of time and system coordination and adaptation of goals in the long term period. Drawing on the theory of logistics, it is possible to define the resource flow in project management as an aggregate of the enterprise’s own and attracted resources, considering in the process of interconnected and interdependent changes and movements carried out to achieve the objectives of the project. Optimization models of rational options selection for attracting additional resources, which allow implementing energy-saving projects under conditions of suspending finances at definite time periods due to a change in the project implementation schedule are described. |
Appears in Collections: |
Наукові видання (ТеСЕТ) |
Views

1

112714174

1

652050201

1

1

79895

1

1

112714176

1

1

1763214605

652050204

2102869462

1

1

178

1

1

1

1

1

652050203

1

717

922919

1763214606

11019644

652050206

-945487910

2418
Downloads

1

3673695

1

1

1

1

1

1

112714171

652050200

1

1

1

1

652050209

1

1

1

762744895

1

652050207

1
Files
File | Size | Format | Downloads |
---|---|---|---|
Kiyko_Druzhinin_Prokhorov_Ivanov_Haidabrus_Grabis_I_2020_07.pdf | 651.99 kB | Adobe PDF | -1459683903 |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.