Please use this identifier to cite or link to this item:
https://essuir.sumdu.edu.ua/handle/123456789/93158
Or use following links to share this resource in social networks:
Tweet
Recommend this item
Title | Refinement of the process capability index calculation |
Authors |
Haievskyi, O.
Kvasnytskyi, V. Haievskyi, V. Szymura, M. Sviridova, L. |
ORCID | |
Keywords |
statistical process control Shewhart control chart control limit specification limit |
Type | Article |
Date of Issue | 2023 |
URI | https://essuir.sumdu.edu.ua/handle/123456789/93158 |
Publisher | Sumy State University |
License | Creative Commons Attribution - NonCommercial 4.0 International |
Citation | Haievskyi O., Kvasnytskyi V., Haievskyi V., Szymura M., Sviridova L. (2023). Refinement of the process capability index calculation. Journal of Engineering Sciences (Ukraine), Vol. 10(2), pp. B8–B15, doi: 10.21272/jes.2023.10(2).b2 |
Abstract |
The variability of product performance is the reason for the introduction of special methods to ensure
product quality, particularly statistical methods. These include introducing statistical process control (SPC) in
production and calculating the process capability index to determine the manufacturing ability to meet the product’s
quality requirements. To a large extent, the ability of a process to meet the requirements was determined by the location
of the process or the mathematical expectation of the controlled quality characteristic value. Process setup center
variability within the boundaries of the Shewhart control chart of the average values was supposed to be the natural
state for a statistically controlled process. However, the calculation of the process capability index did not consider the
possibility of a shift in the actual value of the process setup center for a controlled characteristic from its mathematical
expectation. It was proposed to adjust the process capability index for the setup center’s possible deviation. It
demonstrated the possibility of critical errors in determining the ability of a production process to meet requirements
without considering the process setup center. The effectiveness of the proposed solutions was also demonstrated by the
example of determining the ability of the welding wire manufacturing process to meet the requirements for metal yield
strength of the welded joint of metal bridge span constructions. |
Appears in Collections: |
Journal of Engineering Sciences / Журнал інженерних наук |
Views
Ukraine
89
United States
471
Downloads
India
1
Morocco
1
South Korea
1
Ukraine
68
United States
382
Files
File | Size | Format | Downloads |
---|---|---|---|
Haievskyi_jes_2_2023.pdf | 425.17 kB | Adobe PDF | 453 |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.