Logistics control of the resources flow in energy-saving projects: Case study for metallurgical industry
dc.contributor.author | Kiyko, S. | |
dc.contributor.author | Druzhinin, E. | |
dc.contributor.author | Prokhorov, O. | |
dc.contributor.author | Іванов, Віталій Олександрович | |
dc.contributor.author | Иванов, Виталий Александрович | |
dc.contributor.author | Ivanov, Vitalii Oleksandrovych | |
dc.contributor.author | Гайдабрус, Богдан Володимирович | |
dc.contributor.author | Гайдабрус, Богдан Владимирович | |
dc.contributor.author | Haidabrus, Bohdan Volodymyrovych | |
dc.contributor.author | Janis, Grabis | |
dc.date.accessioned | 2021-01-27T15:11:52Z | |
dc.date.available | 2021-01-27T15:11:52Z | |
dc.date.issued | 2020 | |
dc.description.abstract | The multilevel model for the formation and assessment of resource flows of a metallurgical enterprise is presented, which, at the logistics positions, reconcile the enterprise flow processes at all management levels, providing procedures for regulating the parameters of material and financial flows due to parametric and structural coordination in the short period of time and system coordination and adaptation of goals in the long term period. Drawing on the theory of logistics, it is possible to define the resource flow in project management as an aggregate of the enterprise’s own and attracted resources, considering in the process of interconnected and interdependent changes and movements carried out to achieve the objectives of the project. Optimization models of rational options selection for attracting additional resources, which allow implementing energy-saving projects under conditions of suspending finances at definite time periods due to a change in the project implementation schedule are described. | en_US |
dc.identifier.citation | Logistics control of the resources flow in energy-saving projects: Case study for metallurgical industry / S. Kiyko, E. Druzhinin, O. Prokhorov et al. // Acta logistica. — 2020. — Vol. 7, No.1. — P. 49-60. — DOI:10.22306/al.v7i1.159 | en_US |
dc.identifier.sici | 0000-0003-0595-2660 | en |
dc.identifier.uri | https://essuir.sumdu.edu.ua/handle/123456789/81734 | |
dc.language.iso | en | en_US |
dc.publisher | 4S go, sro | en_US |
dc.rights.uri | CC BY-NC 4.0 | en_US |
dc.subject | energy-saving | en_US |
dc.subject | metallurgical enterprise | en_US |
dc.subject | logistics management | en_US |
dc.subject | resource flow | en_US |
dc.subject | енергозбереження | en_US |
dc.subject | металургійне підприємство | en_US |
dc.subject | управління логістикою | en_US |
dc.subject | потік ресурсів | en_US |
dc.subject | энергосбережение | en_US |
dc.subject | металлургическое предприятие | en_US |
dc.subject | управление логистикой | en_US |
dc.subject | поток ресурсов | en_US |
dc.title | Logistics control of the resources flow in energy-saving projects: Case study for metallurgical industry | en_US |
dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- Kiyko_Druzhinin_Prokhorov_Ivanov_Haidabrus_Grabis_I_2020_07.pdf
- Size:
- 651.99 KB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 3.96 KB
- Format:
- Item-specific license agreed upon to submission
- Description: